WVU Parkersburg memorial clock in Eldon Miller Plaza on the university campus in Parkersburg, West Virginia.
WVU Parkersburg memorial clock in Eldon Miller Plaza on the university campus in Parkersburg, West Virginia.
A clock tower on a brick base in a park, with benches, potted plants, and a building with glass windows in the background on a sunny day with clouds in the sky.

HIGHER EDUCATION CONSTRUCTION

WVU Parkersburg Campus Projects


Laboratory, building-system and interior renovations delivered across three projects at West Virginia University at Parkersburg.

CAMPUS CONSTRUCTION EXPERIENCE

Specialized Improvements Across an Active College Campus

MIRC Construction Services completed three publicly bid projects at West Virginia University at Parkersburg. Together, the projects encompassed specialized laboratory construction, building-envelope and mechanical improvements, environmental remediation and interior renovations.

The work required coordination among university representatives, designers, specialty contractors and building-system trades. Construction was planned around existing facilities and ongoing campus operations, with careful attention to access, temporary protection, environmental controls and project sequencing.

Client: West Virginia University at Parkersburg
Location: Parkersburg, WV
Services:
General Contractor
Project Type:
Higher Education Campus Improvements
Architects: Paradigm Architecture & Pickering Associates
Status: Completed 2014

PROJECT HIGHLIGHTS

Science Laboratory Fit-Up & Casework

MIRC completed two coordinated contract packages within WVU Parkersburg’s New Science Wing, creating an 11,796-square-foot teaching-laboratory environment for chemistry, biology, microbiology, anatomy, genetics, geology, astronomy and physics.

The laboratory fit-up included interior framing and finishes, laboratory water, gas, vacuum and chemical-waste systems, HVAC equipment and ductwork, critical airflow controls, electrical power, lighting, fire alarm and communications systems.

The casework package provided wood laboratory casework, student workstations, epoxy-resin countertops and sinks, laboratory service fixtures, utility connections and fume-hood duct and control connections.

BUILDING SYSTEMS & ENVIRONMENTAL REMEDIATION

Mold Remediation & HVAC Upgrades

MIRC completed a coordinated remediation and building-system improvement project within the existing EDA wing of WVU Parkersburg’s Main Building. Pickering Associates served as the project architect.

The work addressed both affected interior areas and the underlying sources of moisture infiltration. Improvements included roof replacement, below-grade waterproofing, exterior masonry repairs, drainage modifications, a new aluminum storefront entrance and replacement HVAC systems.

Environmental work was completed within controlled containment areas using HEPA-filtered negative pressure. Selective demolition, cleaning, material replacement and interior restoration were coordinated with independent environmental assessment and clearance testing.

Project Scope

  • Controlled mold remediation

  • Temporary containment and HEPA filtration

  • Roof removal and replacement

  • Below-grade waterproofing and drainage

  • Masonry and moisture-control improvements

  • New aluminum storefront entrance

  • Replacement rooftop HVAC equipment

  • Ductwork, piping and controls

  • Testing and air balancing

  • Electrical and interior restoration

MIRC renovated the existing men’s and women’s restrooms within WVU Parkersburg’s Main Building. Designed by Pickering Associates, the 520-square-foot project modernized the spaces while improving accessibility, durability and the overall interior environment.

The renovation included new finishes, plumbing fixtures, toilet compartments, solid-surface vanity tops, lighting and restroom accessories. Mechanical, electrical and plumbing modifications were coordinated with the new architectural layout.

Main Building Toilet Renovations

INTERIOR RENOVATION

Project Scope

  • Selective demolition and reconstruction

  • Moisture-resistant wall assemblies

  • Ceramic plank floor tile

  • Porcelain sanitary cove base

  • Solid-plastic toilet compartments

  • Corian vanity tops with integrated sinks

  • New plumbing fixtures

  • Grab bars and restroom accessories

  • Lighting and electrical modifications

  • Fire-alarm device relocation

Experience Across West Virginia

MIRC Construction Services has completed publicly bid construction and renovation projects for higher education, healthcare, government and institutional clients throughout West Virginia.